AB Klaipėdos nafta as LNG Terminal Operator (hereinafter – the Operator), announces that requests for Klaipeda LNG Terminal two spot cargoes capacities allocation are being accepted as of 5th of May, 2023 from 13:00 EET. With this announcement the Operator is keen to allocate capacities, which each cargo corresponds of one Conventional size cargo, scheduled on August 2023 (see below).
The requests for Spot Cargo Capacity will be accepted till:
Spot cargo Capacity Allocation is performed on a First-Come-First-Served principle, detailed information about allocation of capacities please find the Regulations for use of Klaipeda LNG Terminal.
The main conditions of Spot Cargo Capacity Allocation:
Preliminary Spot cargo LNG regasification capacity usage period:
LNG regasification period may differ if only one of two Spot cargo capacities will be allocated. Final monthly schedule will be announced at the time of drawing up the Monthly Schedule.
Spot cargo delivery window:
The request for allocation of Spot cargo LNG regasification capacity shall be submitted by e-mail [email protected].
On Monday, a liquefied natural gas (LNG) cargo from the United Stats of America ordered by D.TRADING International SA, a subsidiary of DTEK Group, the largest private Ukrainian energy company, reached the Klaipėda LNG terminal operated by the international terminal operator KN Energies. Approximately 160 thousand cubic metres of U.S....
Klaipėda LNG terminal operator, SC KN Energies (hereinafter referred to as the Company), informs natural gas market participants about the planned allocation of SPOT LNG cargo capacity of the LNG terminal under the conditions specified below. The Company, taking into account the provisions of the Regulations for the Use of...
Klaipėda LNG terminal operator KN Energies informs market participants about the planned allocation of LNG regasification capacities for the 2026 terminal gas year. The market will be offered 4 TWh (4 conventional cargoes) of terminal regasification capacity. The invitation and conditions to acquire annual LNG regasification capacities are planned to be announced in December...