The term for applications of candidates for independent Board members of AB Klaipedos Nafta has been extended

2016-11-04 Company news
On 4 November 2016 the Committee for selection of independent Board member candidates(hereinafter – Selection Committee) of AB Klaipedos Nafta (hereinafter – the Company), formed by the decision of the Supervisory Council of AB Klaipedos Nafta, adopted on 16 September, 2016, has extended the term for candidates’ applications.  Applications of the candidates for independent Board members of the Company are accepted until 11 November, 2016.
1. The term for the candidate to be appointed a member of the board – until the end of term of the existing Board of the Company (29 April 2018);
2. Type of selection – interview:
2.1. Stage 1 – selection based on the information provided in the CV and the motivation letter;
2.2. Stage 2 – assessment of the candidates, interviews with selected candidates;
2.3. Stage 3 – assessment of competences and verification of references (if necessary);
2.4. Final stage – decision by the Supervisory Board regarding election of a Board member.
3. Applications of the candidates must be submitted by 11th November 2016 (inclusive);
4. Candidates must submit the following documents: 
4.1. Consent to stand for election to the Company’s independent Board member (Annex 1 to the Notice);
4.2. Bona fides and independence declaration of the independent Board member candidate of AB Klaipėdos Nafta (Annex 2 to the Notice);
4.3. Curriculum Vitae (CV);
4.4. A copy of the personal ID document;
4.5. A copy of the document attesting to education qualification;
4.6. Copies of documents attesting to the required experience;
4.7. Contact details used for sending information to the candidate by the Selection Committee;
4.8. Other required document
5. General, special and qualification requirements for independent Board member candidates are provided in Annex 3 to the Notice.
6. The candidates must submit documents to the secretary of the Selection Committee Rytis Valūnas by email: r.valunas(at)oil.lt, tel. +370 655 66421 and Kristina Kuodienė by email k.kuodiene(at)oil.lt, tel. +370 46 391642.

Panašios naujienos

Klaipėda LNG terminals Company news 2025-10-27

“Independence” turns 11: 11 facts about the Klaipėda LNG terminal

Exactly 11 years ago, on 27 October 2014, the liquefied natural gas (LNG) floating storage and regasification unit (FSRU) Independence reached the Port of Klaipėda. Lithuania’s liberation from the grip of a monopolist became not only an inspiration for the Baltic region but also ensured energy security and the right for consumers...

Klaipėda LNG terminals Company news 2025-10-24

A key step in the Klaipėda LNG terminal electrification project – initial works begin

As part of the shore electricity connection project to the Klaipėda LNG terminal implemented by the international energy terminal operator KN Energies, the first works have begun. The company executing the project, Kauno tiltai, has started cleaning a pipe installed using the horizontal directional drilling (HDD) method and carrying out...

Liquid energy terminals Company news 2025-10-01

KN Energies receives funding for the deployment of electricity storage systems

KN Energies, with the aim of promoting the optimization of renewable energy infrastructure and the efficient use of energy resources, submitted an application to the Lithuanian Energy Agency and secured funding for the implementation of a project under Call No. 03-009-J-0001-J06 “Investment Support for Individual Electricity Storage Devices.” The funding...

All News All News
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.